[PR] この広告は3ヶ月以上更新がないため表示されています。
ホームページを更新後24時間以内に表示されなくなります。

Describes all aspects of Cantonia
Post a reply

Canton–ZyüHõi Intercity Mass Rapid Transit / 廣珠城際軌道交通 / 廣珠城軌

Jul 21st, '11, 00:32

Canton–ZyüHõi Intercity Mass Rapid Transit / 廣珠城際軌道交通 / 廣珠城軌


Zhuhai North Station
Info
Locale Guangzhou
Foshan
Zhongshan
Jiangmen
Zhuhai
Transit type Rapid transit
Number of lines 2
Number of stations 22
Daily ridership 342,000 (2008)
Operation
Began operation 7 January 2011
Technical
System length 142.3km
Track gauge 1435 mm Standard Gauge
[hide]System map


Guangzhou–Zhuhai Intercity Mass Rapid Transit
Simplified Chinese 广珠城际轨道交通
Traditional Chinese 廣珠城際軌道交通
[show]Transcriptions
alternative Chinese name
Simplified Chinese 广珠城轨
Traditional Chinese 廣珠城軌
[show]Transcriptions


Guangzhu MRT in construction, June 2010


Duninggang Tunnel (都宁港隧道) of Guangzhu MRT
Guangzhou–Zhuhai Intercity Mass Rapid Transit, Guangzhou-Zhuhai Intercity MRT or Guangzhu MRT (simplified Chinese: 广州珠海城际快速轨道) is a dedicated, grade-separated passenger railway linking New Guangzhou Station in Panyu, Guangzhou, and Zhuhai Airport in Zhuhai, via Shunde, Zhongshan and Jiangmen, in Guangdong, China.[1]

The railway has partly started operations in January 2011. It will be divided into three parts with a total of 27 stations. Its main line between Guangzhou and Zhuhai City, via Shunde and Zhongshan, is 117 km (73 mi) long, with 17 stations and a maximum speed of 200 km/h (124 mph). Its extension line between Zhuhai City and Zhuhai Airport is 35.3 km (22 mi) long, with 7 stations and a maximum speed of 160 km/h (99 mph). Its spur line between Zhongshan and Jiangmen is 26 km (16 mi) long, with 6 stations and a maximum speed of 200 km/h (124 mph).[2][3]

When fully completed, passengers traveling on the main line between Zhuhai and Guangzhou South will have a choice between a 46-minute non-stop and a 76-minute, 140 km/h all-stop service. The non-stop service is offered between Zhuhai and Guangzhou South only, and travel between Zhuhai (Gongbei) and Zhuhai Airport will be cut down to 25 minutes.[4] It currently takes 50 minutes to travel by auto from Gongbei, Zhuhai to Zhuhai Airport, and 1 hour 30 minutes from Gongbei, Zhuhai to Panyu, Guangzhou.

The construction of the railway began in 2005[5] and it was to be completed by 2010 to cope with the opening of the Guangzhou Asian Games, but missed this deadline.[6]

Contents

[hide]
1 History
2 Stations
2.1 Main Line
2.2 Branch Line
3 References
[edit] History

In April 2004, the ongoing Guangzhou-Zhuhai Intercity MRT traffic's preliminary feasibility study was finished, resulting in a proposed railway alignments, technical standards, and project design details.[7] Soon afterwards, the railway project was included on the list of major projects fo 2005 in Zhuhai.[7] At the first Pearl River Dela Regional Economic and Trade Cooperation Fair on July 14, 2004, the Ministry of Railways and Guangdong's provincial government signed an agreement, forming the Guangdong Pearl River Delta Intercity Rail Company and giving each party a 50 percent share in the joint venture. Thus, the Guangzhou-Zhuhai Intercity MRT was born, incorporating officially on July 29.

On March 16, 2005, China's State Council considered the adoption of the "Bohai Sea, Yangtze River Delta, and Pearl River Delta Intercity Railway Network Plan" [8] during the May 2005 Guangzhou-Zhuhai Intercity MRT preliminary design review. The design of the Guangzhou-Zhuhai project was adjusted, and a single alignment was preliminarily determined. Substantial adjustments were made to the alignment south of Jiangmen, resulting in the current "Nanlang Alignment". The "Nanlang Alignment" runs from Cuiheng Village in Zhongshan to Zhuhai along the east side of Yangangwan Avenue, through the Fenghuangshan Tunnel, along Mingzhu Road, Gangchang Road, and Changsheng Road before reaching Zhuhai's Xiangzhou District.[9]

On December 18, 2005,construction on the Guangzhou-Zhuhai Intercity MRT commenced.[10] Construction of elevated lines in the form of aerial structures accounts for approximately 92.25% of the alignment, allowing for minimal changes in slope and grade that provides for a smooth train ride throughout the system.[11]

On March 25, 2008, the preliminary feasibility study for the Zhuhai(Gongbei)—Zhuhai Airport extension line was released. The 35.3 kilometer westward extension from the original terminus at Zhuhai Station passes over several waterways on its way to Sanzao and Zhuhai Airport, including the Qianshan, Maliuzhou, Modaomen and Niwanmen waterways. Six additional stations will be built, including Wanzai, Xiawan, Lianhua, Hengqin, Sanzao, and Zhuhai Airport. A possible seventh station, Hezhou South Station, will be built in the future depending on the realization of local development. Hengqin Station and Sanzao Station are separated by 15.7 kilometers, of which includes 6.97 kilometers passing over Jinhai bridge, the greatest distance between two stations along this line.[12][13] In addition, provisions for a future connection to the Macau Light Transit System will be made near Hengqin, possibly in the form of an underwater spur line linking to Macau Light Rapid Transit's Cotai line.[14] Construction, which is scheduled to be completed in 2011, will effectively link cities in the Pearl River Delta with Macau by rail.[12][13][14] The light rail began operations between Guangzhou South and Zhuhai North (formerly named Jintang) Stations on January 7th 2011. The extension of the line to GongBei via the Feng Huang Shan Tunnel is still delayed indefinitely. fares between Guangzhou and Zhuhai North are 44 RMB 1st class; 36 RMB economy class and 22 RMB for students. The journey time is 39 minutes. Express buses are available to link Zhuhai North Station with Xiangzhou and Gongbei, while regular buses 3 A & 65 serve the local population.

[edit] Stations

[edit] Main Line

Station Name
English
Station Name
Hanzi
Total
Distance
Location
Transfer
Guangzhou South 广州南 0 Panyu, Guangzhou
Bijiang 碧江 5
Shunde, Foshan
Beijiao 北滘 11
Shunde 顺德 15
Ronggui 容桂 32
Xiaolan 小榄 45 Xiaolan, Zhongshan
Dongsheng 东升 52 Dongsheng, Zhongshan
Zhongshan North 中山北 64 Shiqi, Zhongshan
Zhongshan 中山 70 Dongqu, Zhongshan
Nanlang 南朗 83 Nanlang, Zhongshan
Zhuhai North 珠海北 93 Xiangzhou, Zhuhai
[edit] Branch Line

Station Name
English
Station Name
Hanzi
Total
Distance
Location
Transfer
Xiaolan 小榄 45 Xiaolan, Zhongshan
Guzhen 古镇 54 Guzhen, Zhongshan
Jiangmen 江门 65 Jianghai, Jiangmen
Xinhui 新会 71 Xinhui, Jiangmen
[edit] References

^ Intercity MRT in progress
^ PRD Planned Rail Network – West Bank
^ Guangzhou-Zhuhai MRT Extension Proposal: from Gongbei to Zhuhai Airport
^ 廣珠城際軌道交通工程設計方案初定,力爭七月正式動工
^ Guangzhou-Zhuhai RMT
^ Lynns Industrial Park, Jiangmen
^ a b 廣珠城際鐵路走向及技術標準初步確定 4年後通車
^ 国务院通过珠三角城际轨道网规划
^ 廣珠城際軌道珠海段預計於今年上半年開工建設
^ 广珠城际轨道动工 顺德到珠海仅需40分钟
^ 乘坐广珠城际轨道将与城市公交一样便捷
^ a b 廣珠城際軌道將延伸至珠海機場
^ a b 广珠轻轨拟延伸至珠海机场
^ a b 粵澳聯席會議達共識 廣珠城際軌道擬連澳門輕軌

---------------------

http://en.wikipedia.org/wiki/Guangzhou- ... id_Transit
Attachments
Guangzhou-Zhuhai_MRT.png
Post a reply